Title |
Last Date & Time of Submission |
Invitation for quotation for supply of computer components |
14-Mar-2019 2.00 PM |
Invitation for quotation for supply of computer components |
25-January- 2019 4:00 PM |
Invitation for quotation for supply of computer components |
25-January- 2019 4:00 PM |
Invitation for quotation for supply of goods |
19-Dec-2018 2.00 PM |
Civil works for main building South Block |
19-Jun-2014 3:30 PM |
Electronics and Communication text books |
12- June- 2014 4:00 PM |
Mechanical Engineering books |
12-June-2014 4 PM |
Extension works of buildings |
22-Apr-2014 4 PM |
PRIMAVERA P6 Enterprise |
11-Apr-2014, 2 PM |
Purchase of electrical engineering books |
21-Apr-2014 2 PM |
Laptop Computers |
2-April-2014. 2 PM |
Civil Engineering Books |
02-April-2014, 4 PM |
Particle size analyzer |
30-Apr-2014 2 PM [Extended] |
Applied Science text books |
26-Mar-2014 4 PM |
Computer Science text books |
26-Mar-2014 4 PM |
Production engineering books |
26-Mar-2014 4 PM |
Civil works for main building north block |
26-Mar-2014 3PM |
Measuring Equipments & power Supplies |
21-Mar-2014 4 PM |
MPFI engine test rig |
12-Mar-2014 2 PM |
Electrical discharge machining |
15-Mar-2014 2 PM |
Pneumatic Hydraulic Element |
11-Mar-2014 4 PM |
Upgradation of ANSYS Academic Research |
11-Mar-2014 4 PM |
Temperature Scanner |
11-Mar-2014 4:00 |
RF and Microwave Simulation Tool |
10-Mar-2014 4 PM |
Bridges and Potentiometers |
05-Mar-2014 2 PM |
Machine Tools for Electrical Work shop |
05-Mar-2014 2 PM |
Electrical Equipments for EEE Workshop |
20-Mar-2014 2 PM |
Electronic Equipments for EEE workshop |
05-Mar-2014 2 PM |
Printer Scanner and Copier |
04-Mar-2014 4PM |
Refrigerator |
04-Mar-2014 2 PM |
Portable Crane |
03-Mar-2014 2 PM |
Push pull Jack |
03-Mar-2014 2 PM |
Video conferencing equipments |
21-Feb-2014 4 PM |
Computer Table and chair |
25-Feb-2014 4:00 PM |
Chemistry Lab Equipment-2 |
25-Feb-2014 2 PM |
Chemistry Lab Equipment-1 |
25-Feb-2014 2 PM |
Computer server |
21-Feb-2014 4 PM |
ORACLE SOFTWARE |
21-Feb-2014 4 PM |
Campus Network Infrastructure Development |
21-Feb-2014 4 PM |
Air conditioner |
21-Feb-2014 2 PM[Extended Date] |
Structural Engineering Lab Equipments |
20-Feb-2014 2 PM |
Steel Furniture |
11-Feb-2014 pm |
Laptop computers |
14-Feb-2014, 4 PM |
PORTABLE CRANE |
07-Feb-2014 4PM |
Voltage and current measuring meters |
03-Feb-2014, 2 PM |
Push Pull Jack |
03-Feb-2014, 2 PM |
Universal viscometer |
05-Feb-2014, 2 PM |
Electrical machines lab |
20-Jan-2014, 2 PM |
Civil works for Chemical Block |
07-Jan-2014, 4 PM |
Heat transfer operations lab equipments |
15-Jan-2014, 4 PM |
Mechanical operations lab equipments |
15-Jan-2014, 4 PM |
VLSI design package |
17-Jan-2014 2 PM |
VLSI front end tool |
15-Jan-2014 2PM |
optical fibre trainer kit |
08-Jan-2014 2 PM |
Optical link simulation tool |
08-Jan-2014 2 PM |
Temperature scanners 12 channels |
2-jan-2013 2 PM [EXTENDED DATE] |
Panel Board For Electrical Machines Lab |
14-Jan-2014 2PM |
Electrical Workshop Equipments |
10-Jan-2014 2PM |
Ultrasonic Digital Flaw Dectector |
13-Dec-2013 2PM [Extended Date] |
Digital tool tip temperature indicator |
10-Dec-2013 2PM [Extended Date] |
Inverted Base Submerged Arc Welding Machine |
13-Dec-2013 2PM [Extended Date] |
Grinding tool dynamometer |
10-DEC-2013 2PM [Extended Date] |
Measuring equipments and power supplies |
18-Dec-2013, 2PM |
CRO and Function Generators |
13-Dec-2013, 2PM |
Forced draft cooling and Indirect airconditioning |
18-Dec-2013, 2 PM |
Robot: Supported with 3D graphics software 5 axis |
06-Dec-2013, 2 PM |
Digital angle gauge |
29-Nov-2013, 2 PM |
Data acqistion |
11-Dec-2013, 2 PM |
Absorption in packed bed , wetted wall column, and |
06-Dec-2013, 2 PM |
Flow, Level, Pressure and temperature controller |
06-Dec-201,2 PM |
Liquid extraction, Rotary drier and Sieve plate |
06-Dec-2013, 2 PM |
Vapour absorption test rig |
29-Nov-2013, 2 PM |
Mechanical Engineering books |
25/11/2013 , 2PM |
Civil Engineering books |
25/11/2013 , 2PM |
Composite wall, Natural Convection and etc … |
18/12/2013 , 2PM |
HC, CO, NOx Gas Analyzer |
18/12/2013 , 2PM |
Refrigeration Test Ring |
11/12/2013 , 2PM |
Voltage and Current Measuring Meters |
20/11/2013 ,2PM |
Spectrum Analyser and Communication Trainer Kits |
25/11/2013 , 2PM |
Optical time reflectometer |
19/11/2013 ,2 PM |
Microwave bench with Klystron and gunn power suppl |
19/11/2013 ,2PM |
Equipments for Product Design Lab ECE |
19/11/2013 ,2PM |
Power Supplies and Trainer Kits |
November 18, 2 PM |
Bridges and potentiometers |
Extended to November 15 2 PM |
Office Table And Chair |
Last date and Time of /submission: 04/12/2013, 2PM |
Autocollimator |
Last date and Time of /submission: 04/12/2013, 2PM |
Pressure Calibrator |
Last date and Time of /submission: 04/12/2013, 2PM |
Fuel Testing Laboratory Equipments |
Last date & Time of Submission :11/11/2013 2PM |
MPFI Engine Test Rig |
Last date & time of submission : 27/11/2013 2PM |
Magnetic Crack Detector |
Last date & time of submission :27/11/2013 2PM |
Production Tooling Lab Equipment |
Last date & time of submission : 27/11/2013 2 PM |
Surface Roughness Tester |
Last date & time of submission : 20/11/2013 2 PM |
Reaction Engineering Lab Equipments |
Last date & time of submission :15/11/2013 2PM |
Hydraulic Lab Equipments |
Last date & time of submission : 8/11/2013 2PM |
Linear Variable Differential Transformer (LVDT) |
Last date & time of submission : 08/11/2013 2PM |
Concrete lab equipments |
Last date & time of submission : 11/11/2013 2PM |
Environmental lab equipments |
Last date & time of submission : 11/11/2013 2PM |
Slip gauges, MITUTOYO |
Last date & time of submission :28/10/2013 2PM |
ANSYS FLUENT software version 13 |
Last date & time of submission :28/10/2013 2 PM |
Sine bar |
Last date & time of submission : 08/11/2013 2 PM |