SI.No |
Title of the project |
Funding Agency / Client |
Amount in Rs |
Year |
1 |
Traffic Survey at Puthenchantha, Varuthumukk at Nedumbana GP |
LSGD Sub Division, Mukathala Block Panchayath |
— |
2024-25 |
2 |
Structural stability evaluation and Non-destructive testing of 70 lakh litres capacity overhead tank at Observatory Hills, Thiruvananthapuram |
Kerala Water Authority (KWA), Thiruvananthapuram – 695 033 |
35,400 |
2024-25 |
3 |
Structural stability evaluation of Kavanad shopping complex buildings owned by Kollam Municipal Corporation in Kavanad Market of Kollam district |
Kollam Municipal Corporation |
23,600 |
2024-25 |
4 |
Structural stability evaluation of TM Varghese Hall Building owned by Kollam Municipal Corporation in
Division 50 of Kollam
district |
Kollam Municipal Corporation |
23,600 |
2024-25 |
5 |
Aggregate testing |
Assistant Engineer, PWD Building Section, Kottarakkara |
25,920 |
2023-24 |
6 |
Tests on aggregate and bitumen |
Kerala South Coastal Area Development Corporation, Kollam |
27,720 |
2023-24 |
7 |
Traffic Survey |
LSGD Subdivision, Mukathala Block Panchayat, Kollam |
99,000 |
2023-24 |
8 |
Mix Design BM & BC |
PWD Roads Section, Kollam |
30,000 |
2023-24 |
9 |
Structural design of the proposed building of Samoohya Padana Kendram in Archal Ward Nirappil Colony in Yeroor Grama Panchayat, Kollam |
LSGD (LID & EW) Section Yeroor Grama Panchayat, Yeroor, Kollam |
30,000 |
2023-24 |
10 |
Structural design of a steel pedestrian bridge at Kallar ecotourism centre near Chappath in Vithura section of Pauthippally range, Thiruvananthapuram Forest Division |
The Divisional Forest Officer, Thiruvananthapuram |
30,000 |
2023-24 |
11 |
Assessment of volume of solid waste in the waste dumpyard in Chathannoor Grama Panchayat, Kollam |
Piravanthoor Grama Panchayat, Kollam |
30,000 |
2023-24 |
12 |
Structural design of overhead water tank, sedimentation tank, sump tank for vannamei hatchery, Neendakara |
Harbour Engineering Section No. 1, Sakthikulangara, Kollam |
30,000 |
2023-24 |
13 |
Preparation of Detailed Project Report (DPR) for the proposed 100 bed working women’s hostel in Anchal Block Panchayat, Kollam district under PMJVK 2018-19 scheme |
Anchal Block Panchayat, Kollam |
2,50,000 |
2023-24 |
14 |
Steel Structure Design for the roofing of Open Pavilion of Chandrashekharan Nair Stadium , Thiruvananthapuram |
Kerala Police Department |
1,00,000 |
2020-2021 |
15 |
Renovation and Design of the Existing Town Hall Building Kollam |
Secretary, Kollam Coorperation |
35000 |
2020-2021 |
16 |
Sand Replacement of Kudomon EMS Stadium Pathanamthitta |
KITCO |
1,00,000 |
2020-2021 |
17 |
Structural design and preparation of Chithara Kaipetta bridge |
Assistant Executive Engineer, LSGD, Chadayamangalam Block Panchayat, Kollam |
76000 |
2020-2021 |
18 |
NDT of tunnels at Kottayam Railway Station |
The Office of the Sr. Section Engineer (Works), Southern Railway, Kottayam |
30000 |
2020-2021 |
19 |
Proof checking of the structural design of court complex building at Peerumedu, Idukki |
Bharat Engineering Innovation Design and Consultancy Pvt Ltd., Ernakulam |
70000 |
2020-2021 |
20 |
Structural design of Panchayath complexes for Kadakkal, Eroor, Erathu Grama Panchayath |
Secretary, Kadakkal, Eroor, Erathu Grama Panchayath, Kollam |
75000 |
2020-2021 |
21 |
Structural design of Alappuzha dry dock and associated buildings |
State Water Transport Department, Kerala |
180000 |
2020-2021 |
22 |
Dr. Ramaswamy K P |
State Water Transport Department, Kerala |
200000 |
2020-2021 |
23 |
Proof checking of design of Kodungalloor municipality building |
The chair person, Kodungalloor Municipality, Kerala |
50000 |
2020-2021 |
24 |
Preperation of DPR for the Rejuvenation and Conservation of Thamarachal Lake, Puliyoor |
LSGD, Alappuzha |
500000 |
2020-2021 |
25 |
"Carehome Project" for Kollam district - Planning, and structural design of buildings |
Co-operative department, Govt. of Kerala (Rebuild Kerala Initiative) |
150000 |
2020-2021 |
26 |
Survey for widening of NH 744 (Koikkal to Karicode and Kundara Pallimukku) |
NHAI ,Planning Board, Revenue Department, PWD , KSTP |
700000 |
2020-2021 |
27 |
Construction of rural roads under Alappuzha LSGD using PAMA mix (Alappuzha LSGD and Samsung Ascon Pvt. Ltd.) |
LSGD |
50,000 |
2020-2021 |
28 |
Assistant Executive Engineer LSGD Sub Division Anchal Block Panchayat Kollam. |
Geotechnical site Investigation for the proposed School Building at Aryankavu Government LPS under Anchal Block Panchayat. |
73,600 |
2020-2021 |
29 |
Soil Investigation Work for the Proposed site of Vanitha Vyvasaya Kendram at Edamon under Thenmala Grama Panchayat, Pathanamthitta. |
Assistant Engineer ,LSGD Section, Thenmala G P Pathanamthitta |
66,100 |
2020-2021 |
30 |
Geotechnical Investigation for proposed Apartment Project at Thazhakkara Grama Panchaya, Alapuzha |
Joint Registrar (General) Alapuzha 6-7-2020 |
87,250 |
2020-2021 |
31 |
Soil Investigation Work for proposed site of school building in Govt. UPS at Vellooppara under Chadayamangalam Grama Panchayat, Kollam |
Assistant Engineer LSGD Section Chadayamangalam G.P Kollam |
58,000 |
2020-2021 |
32 |
Soil Investigation Work for proposed site of Flat construction(Care home project second stage)under Enadimangalam Grama Panchayat, Pathanamthitta |
Joint Registrar Cooperative Society General Office Pathanamthitta |
86,000 |
2020-2021 |
33 |
Soil Investigation Work for proposed site of Ladies hostel under KILA,CHRD, Kottarakara |
Dr. Sudha Director, KILA Thrissur |
69,000 |
2020-2021 |
34 |
Evaluation of rutting potential of bituminous mixes using refusal density approach Evaluation of existing road condition of the base layers of pavement |
Kollam Municipal Corporation |
3,00,000 |
2019-2020 |
35 |
Inspection, NDT and structural design for renovation of DPC Building Kollam |
Executive Engineer, LSGD Engg Division, District Panchayath, Thevally, Kollam |
54000 |
2019-2020 |
36 |
NDT of railway tunnels 1-5 from Trivandrum to Nagercoil |
DRM (Works), Trivandrum Division, Southern Railway, Kollam |
75000 |
2019-2020 |
37 |
NDT of railway bridges between Ambalapuzha and Haripad |
Deputy Chief Engineer,Construction II, Southern Railway, Trivandrum |
235000 |
2019-2020 |
38 |
Executive Engineer, Kollam Corporaion |
Soil Investigation Work for the Proposed site of Anganavadi building at puthenthuruthu, Kollam Corporation |
59,500 |
2019-2020 |
39 |
The Assistant Engineer, LSGD Section, Thalavoor Grama Panchayat |
Soil Investigation Work for the Proposed site of three cell box culvert of 12m total length and 6m width at Thalavoor Grama Panchayat |
74,600 |
2019-2020 |
40 |
The Secretary Kunnamthanam Grama panchayat, pathanamthitta |
Soil Investigation Work for the proposed Office building at Kunnamthanam Grama panchayat, pathanamthitta |
59,500 |
2019-2020 |
41 |
Parking Demand Analysis |
Town and Country Planning |
2,50,000 |
2018-2019 |
42 |
Evaluation of Structural Stability of Govt. buildings for the issue of fitness certificate by LSG Department |
LSG Department, Govt. of Kerala |
51,900 |
2017-2018 |
43 |
Topographic survey from Vellanathuruth mine to IRE Chavara plant |
Indian Rare Earths Ltd. Kollam |
27450 |
2017-2018 |
44 |
Structural design of new buildings owned by LSGD and other state Govt. Departments |
LSG Department, Govt. of Kerala |
47,510 |
2017-2018 |
45 |
Valuation of real properties (buildings) |
Kerala Minerals and Metals Ltd. (KMML), Chavara |
3,00,000 |
2017-2018 |
46 |
Design of repair yards, dry docks and jetties |
Steel Industries Limited Kerala (SILK) |
1,83,342 |
2017-2018 |